TRAFFIC ADVISORY
N3 full closure to facilitate blasting between Ashburton and Market Road
Pietermaritzburg, 19 September 2024 – Part of the N3 will be fully closed on 26 September and 1 October 2024. This is to facilitate blasting next to the N3 at the Ashburton Interchange as part of the Ashburton to Market Road upgrade project, the South African National Roads Agency SOC Limited (SANRAL) has announced.
“The N3 closure will take place between the Ashburton and Market Road Interchanges. Closures will also be necessary on Pope Ellis Drive from R103 intersection to Ashburton Interchange which is in the vicinity of the blasting activities,” said Jason Lowe, SANRAL’s Eastern Region Project Manager.
Traffic accommodation team with the assistance of the Road Traffic Inspectorate (RTI), will monitor the diversion of traffic during the closure.
The road closure will take place as follows:
26 September 2024 (Thursday):
14h30: Close N3 and secondary road and blast.
14h30 to 14h55: Clean up any debris on all roads.
14h55 to 15h00: Final Road Safety Inspection
15h00: Re-open N3 and secondary road for all vehicles.
1 October 2024 (Tuesday):
14h30: Close N3 and secondary road and blast.
14h30 to 14h55: Clean up any debris on all roads.
14h55 to 15h00: Final Road Safety Inspection
15h00: Re-open N3 secondary road for all vehicles.
The R103 route will be available as an alternative route during the blast. Substantial delays are, however, likely as the R103 is unable to handle the same volume of traffic as the N3.
The closure may need to be adjusted depending on weather conditions on the day. If that happens, a second notice with information of the new time will be issued.
“We ask motorists to be patient during the closure and to plan and adjust their trips, especially their leaving times, to accommodate the closure while still adhering to speed limits. SANRAL apologises to the motoring public for any inconvenience caused and thanks them for their patience during the ongoing road construction,” said Lowe.
ALTERNATIVE ROUTES:
FIGURE 1: ALTERNATIVE ROUTE FOR BLASTING.
NOTE: ASHBURTON/ POPE ELLIS WILL BE CLOSED FOR BLASTING TRAFFIC WILL BE DIRECTED VIA THE R103 ROUTE.THE TRAFFIC WILL BE ALLOWED TO TAKE THE MARKET ROAD OFFRAMP TO THE N3 MAINLINE AS SHOWN IN FIGURE 1 ABOVE IN RED.
//Ends