19 October 2026, Gauteng – The South African National Roads Agency SOC Limited (SANRAL) wishes to inform road users of temporary lane closures on the N3 national road at the Van Buuren Interchange (km 26). The closures are required for the removal of existing bridge joints and installation of new claw and gland joints at Van Buuren Road.
The details of the closures are as follows:
Dates:19 October 2026 to 30 October 2026 (Weather dependent)
Location: Between km 26 to km 27 South Bound Carriageway Time: 24 hours per day
Duration: Lane closures will be implemented progressively, leaving two lanes open at all times for traffic flow on the affected carriageway.
Closure Lengths: The lane closure length will not exceed 2 km excluding the transitions.
The sequence of works to be followed are as follows:
- The partial closure of the South Bound Carriageway 24 hours per day to replace the joints in the fast lanes section. A minimum of two slow lanes will be open on the South Bound Carriageway for the length of the work area.
- Once completed, a partial closure of the South Bound Carriageway 24 hours per day to replace the slow lane joints will be implemented. A minimum of two fast lanes will be open on the South Bound Carriageway for the length of the work area.
SANRAL urges road users to:
- Plan their trips accordingly.
- Adhere to the traffic accommodation signage and the flag persons advanced warnings.
- Exercise patience and caution while navigating the affected area.
- Seek alternative routes to their destination.
- Avoid this section of the N3-12 SBC for this time period if possible.
SANRAL apologises for any inconvenience caused and the roads agency remains committed to improving the safety and quality of our national roads.
– Ends –
____________________________________________________________________________________
For editorial content or additional information contact Lwando Mahlasela on 082 440 5305 or pressoffice@nra.co.za